Assign collection and disposal in the work order
For washing, plastering or grouting work, write down which tasks will generate wastewater, where the crew will collect it and where it will go. Before the visit, name a crew lead to verify that the collection point is accessible and the equipment is ready. Name who will confirm the disposal destination and any conditions for using it before work begins. Review the plan with the owner while there is still time to arrange access.
Confirm the destination and any sewer conditions
Charlotte’s guidance for wastewater from washing, plastering and grouting calls for disposal where it cannot reach a storm drain or creek. If the proposed destination is the sanitary sewer, have the person named in the work order call Charlotte Water at 704-525-6435 before any discharge to ask what rules and instructions apply to the job. Record the instructions and, if approval is required, who will obtain it and where the crew can find it. Give the crew the confirmed route and any conditions before work starts.
If the visit also includes filter backwashing, give it a separate entry in the work order. Use the backwash guidance to confirm its destination.
Give the owner a specific completion note
Record the collection point and disposal destination the crew actually used, along with any changes. For example, if trucks block the planned collection area, pause the work that generates wastewater. Have the person named in the work order confirm an alternative and brief the crew before that work continues. Leave the owner a copy of the service record so a later crew can check the previous arrangement against the next job’s scope.