Residential Pool Site Plans in Cary and Raleigh: What to Check Before Finalizing the Layout

Cary’s guidance lists what to show on the pool plot plan and which permit copy to include for a lot with a septic field. Raleigh’s guidance identifies which easements restrict placement, when Raleigh Water must approve the pool location, where pools and decks cannot be built on septic lots, and what triggers lot grading plan requirements.

Editorial desk   ·   2026-11-25
a swimming pool with a long metal railing next to it
Photo by Artem Kniaz on Unsplash

Cary plot plan and septic permit records

Show the proposed pool, all decking or paving, above-ground mechanical and utility equipment, and screening on the plot plan. Include a separate sketch of the pool barrier fence with the application. [Cary Inspections & Permits Department](https://www.carync.gov/home/showpublisheddocument/1615/638948304888400000)

If the lot has a septic field, include a copy of Wake County’s Wastewater Accessory Structure permit. [Cary Inspections & Permits Department](https://www.carync.gov/home/showpublisheddocument/1615/639092684383100000)

Raleigh easements, septic areas and grading

Use a legally recorded property map from the Wake or Durham County Register of Deeds to verify the location of public easements. Raleigh prohibits installing pools, decks, pool equipment and fences in or over public sewer easements or public or private drainage easements. If any of those easements exists anywhere on the property, Raleigh Water must approve the proposed pool location. [City of Raleigh, Installing a Pool or Spa](https://raleighnc.gov/permits/services/installing-pool-or-spa)

Pools and decks may not be built over septic or wastewater systems or their repair areas. [City of Raleigh, Installing a Pool or Spa](https://raleighnc.gov/permits/services/installing-pool-or-spa)

Raleigh’s lot grading plan requirements apply if the project adds 800 square feet or more of impervious surface or concentrates runoff, such as into a channel, pipe or downspout. Check both conditions before settling on the deck footprint and drainage design. [City of Raleigh, Installing a Pool or Spa](https://raleighnc.gov/permits/services/installing-pool-or-spa)

**Builder takeaway (inference).** Reuse a base drawing template for the pool, deck and equipment, and keep a separate checklist for each jurisdiction. For Cary, use the checklist to confirm screening is shown, the barrier sketch is attached and the Wake County permit copy is included when the lot has a septic field. For Raleigh, use it to track the recorded map, easement and septic placement checks, any required Raleigh Water approval and both grading triggers.