Carry the arrow beyond the patio
On the review copy, trace each proposed drainage arrow with a pencil. When it reaches the concrete edge, continue to the next feature the water would meet. If that feature is the house, a gate threshold or a neighboring lot, mark it for the design team. The point of the exercise is to find a missing design decision before the concrete crew arrives.
Check the grading trigger against the whole drawing
Raleigh’s pool application guidance identifies both adding 800 square feet or more of impervious surface and concentrating flow as conditions requiring a lot grading plan. Have the project designer check the full proposal against the current city wording. A small area by itself does not answer the concentrated-flow question.
Pass one version to the crew
Mark the reviewed grading-sheet date on the installation layout. If a homeowner later extends the patio to a new grill area, record the added surface and ask the designer whether it affects drainage and the reviewed plan. Build the revision into the handoff to the concrete crew. A verbal instruction to add a strip along the fence leaves nobody holding the revised drainage drawing.