Put the wastewater paperwork on the table
For a Cary lot in Wake County with a septic field, the town's residential pool guidance asks for a copy of the Wake County Wastewater Accessory Structure permit. Bring that paperwork and any septic layout you have to the design meeting. Ask the builder to mark the existing system and designated repair area on the pool drawing using the available records and flag any uncertain boundaries. Before you approve the redraw, ask the wastewater authority for your property to confirm the repair-area limits and where the pool and deck can go. Cary lists 919-856-7400 for information about the Wake County permit.
For a Cary address outside Wake County, check which wastewater office serves the property and ask that office what paperwork applies.
Tell the builder which part of the patio earns its space
Suppose the seating apron crosses the confirmed repair-area boundary on the first sketch. If a table near the kitchen matters more than loungers at the far end, ask for a wider terrace on the house side and pull back the septic-side deck edge so it sits outside the confirmed repair area and within the footprint the wastewater authority says is allowable. Ask the builder to compare that layout with a smaller shell if the revised walking route or seating area feels cramped.
Approve the drawing and quote together
Request a dated redraw with the confirmed repair boundary, pool and deck outlines, steps, and equipment labeled. Check that the redraw matches the footprint confirmed by the wastewater authority, then trace the route from the house to the pool gate. Before signing off, check that the revised quote describes the same paving and seating area you just reviewed.
